Bathroom Renovations

Chris and I are taking the 3 bedroom ranch, "fixer upper" that he purchased four years ago, and are working on major upgrades.

Here's our list:

-Gut and renovate the full bath. New cabinet, new floor, new sub floor, new tub and shower and surround, beadboard and trim, new mirrors, lighting, etc.
-Gut and renovate the half bath. New pedestal sink, new wall color, beadboard and trim, new floor, new mirror, and ligthing.
-Paint kitchen cabinets, add new hardware, new HD laminate counter tops, new lighting,new over the stove microwave, installing dishwasher, new ceramic floor.
-Paint hallway trim and doors white. ( Previously stained wood.)
-Replace sliding hall closet doors with bifold doors.
-New front door, and storm door.
-New french door for the back of the house.
-New black shutters. ( Now they're YELLOW!)
-New exterior lighting.
-New front walk.
-New lamp post.

It's been a loooong summer, and here's some pictures of our progress on the full bath! The top pictures are where we are now, and the bottom ones are where we started.