Here's our list:
-Gut and renovate the full bath. New cabinet, new floor, new sub floor, new tub and shower and surround, beadboard and trim, new mirrors, lighting, etc.
-Gut and renovate the half bath. New pedestal sink, new wall color, beadboard and trim, new floor, new mirror, and ligthing.
-Paint kitchen cabinets, add new hardware, new HD laminate counter tops, new lighting,new over the stove microwave, installing dishwasher, new ceramic floor.
-Paint hallway trim and doors white. ( Previously stained wood.)
-Replace sliding hall closet doors with bifold doors.
-New front door, and storm door.
-New french door for the back of the house.
-New black shutters. ( Now they're YELLOW!)
-New exterior lighting.
-New front walk.
-New lamp post.
It's been a loooong summer, and here's some pictures of our progress on the full bath! The top pictures are where we are now, and the bottom ones are where we started.



No comments:
Post a Comment